court blocked Since the TLG in November 2008 had announced that all buildings with the exception of the historical cold stores (see picture) to be obtained, the initiative has worked suggest that repaired the flat roofs on buildings be set.
Unfortunately this has not been reached.
A wing was inhabited by flat roof damage drawn so strongly affected, one in the third Floor living pregnant woman (the building has 4 floors) at a time in a wet house sat. Despite the request to remove the tenant the damage, nothing happened. The damage spread to the 2nd OG from, one of which Another family was affected.
There's only initiative and so were saved 100m ² flat roof area. Cost: 200 € ridiculous. But unfortunately it was not enough, as the water ran from the flat roofs of the adjacent factory building in the building and the reinforced concrete ceiling is a way back to the wing was looking for.
The building authority of the district has indeed made measurements and the tenants notified in writing, the TLG is required to drain the flats - but nothing happened. Authorized by the TLG painting company took because of the unmanageable task of it, the mildew without removal of the causes to simply remove the flight and was not seen.
When the child was 8 months old, the woman then pulled out yet. The prospect of her child was to provide a healthy life in a home not here. nationwide self
Since the TLG, we turned to the Bundesfinanzministerum and demanded the restoration of the flat roofs. The letter is attached to pictures of the damage.
under number Fölster / 2009/0319708 / Fölster VIII A 2 - FB 5037 / 0
we received by mail on 18.05.2009, the answer
"The defects you mentioned are the TLG known you were in agreement. Tenants already been, or will it still work on it. This is particularly the moisture damage in the wing of the house. TLG can perform all necessary repair work. Because of the poor overall condition of the building, it is difficult to achieve a single maintenance action for the tenant satisfactory condition. A total renovation is indispensable "
Now it is October 2009 and it has always done anything yet, although - something already..
at the vacant since 1995 wing (14 years of empty apartments in a federal company!), The TLG Immobilien GmbH suddenly discovered damage that led to the tenants was closed virtually overnight by the Court.
Writing with the notification was on 03 September by an outside lawyer source.
On 04 September, a Friday, started work on the locks of the courtyard.
On Monday, 07.09. was already a big truck a scaffolding company.
A rogue who thought process of the construction companies were more informed than the tenants ...
found in the yard instead of our farm festivals.
He was largely self-designed by some tenants and maintained (the caretaker has mowed the lawn).
The measure represents a significant restriction for the tenants (A rogue who thinks this was intended).
The passers in the courtyard built tunnel at least as expensive as would have been a backup of the flat roofs. Only that would have avoided in securing the flat roofs of structural damage to the listed buildings können.Doch the roofs are still not protected. (A rogue who thinks behind it lies a purpose ...)
In August, the Heritage Office had carried out an inspection. Happened to have the owner's representatives and key for the factory building and the vacant wing accidentally present (A rogue who ...). What did the Heritage Office has, however, served to advance to make clear the need for action.
Whether something happened?